最新消息
星能公司承攬台電86部風力發電機組運維工作
資料來源: 星能股份有限公司
星能公司承攬台電86部風力發電機組運維工作
星能公司與長期合作夥伴Vestas公司於今年1月取得台電86座陸域風力發電機組五年運維合約。由星能與Vestas共同執行107~111年台電80部Vestas V80及6部Gamesa G80總共達167MW之運維工作,涵蓋台灣地區8座風場。
「星能於104年踏入風機運維領域,在風機效能提升及風場的營運績效上皆取得重大進展,也非常高興能與Vestas合作承攬台電未來五年的風機運維案」星能蔡董事長進發表示。
藉由陸域風場運維累積的經驗,星能目前正積極準備投入離岸風場運維的領域。
SEC won a O&M service tender of TPC's 86 WTGs
In collaboration with its long term partner, Vestas , Star Energy Cooperation recently won a 167MW full-scope O&M service tender issued by the Taiwan Power Company (TPC), whereby both Vestas and Star Energy will provide maintenance to TPC's entire Vestas fleet and Gamesa fleet over the next 5 years. The tender covers 154.64 MW Vestas V47 and V80 turbines and 12 MW Gamesa G80 turbines across 8 sites in Taiwan.
“We are very pleased to have been awarded this significant tender with Vestas. SEC has serviced TPC’s wind assets since 2015. Since then, SEC' assistance has helped improve the site condition and performance significantly.”said Mr. Tsai Chin-fa, Chairman of Star Energy Corporation (SEC),with this excellent O&M record,SEC now is foucs on offshore Wind farm WTG O&M.
BACK
